Connecting your experience
Connecting your experience
Fibre routes support building backbones and links between network locations. The route, pathway, termination points and test requirements are reviewed to create a practical installation plan for the site.
Discuss this solution
Discuss your requirements, users and project priorities.
Review the site, existing systems and installation conditions.
Prepare a practical scope, equipment schedule and BOQ where agreed.
Confirm inclusions, exclusions, assumptions and commercial terms.
Coordinate the agreed installation and system checks.
Share agreed records and discuss ongoing support needs.
These deliverables are agreed for each project and set out in the quotation or written scope.
The route and installation method depend on distance, pathways, site access and environmental conditions.
Splicing, termination and testing can be included when confirmed in the project scope.
The choice depends on the link distance, equipment and project requirements; it is confirmed during technical planning.
The floor plan, users, connected devices, coverage requirements and future needs are reviewed before a point or access point schedule is proposed.
Existing cabling, equipment, available capacity and site pathways are reviewed before suitable expansion options are scoped.
BENGALURU · SUNNET NETWORK
Share your site, requirements and priorities. The team can help confirm the appropriate next step and scope.